.6129 LEVEL 2 PLUMBING COURSE
Sponsored links
FULL 6129 LEVEL 2 PLUMBING (CITY & GUILDS).
THIS WILL GIVE ANYONE THE UNDERPINNING KNOWLEDGE TO BECOME A PLUMBER. THE COURSE IN RECOGNISED THROUGHOUT THE WORLD AS A BENCHMARK IN PLUMBING
COURSE TAKES 8 WEEKS TO COMPLETE.
ALL COURSES ARE RUN IN OUR MIDLANDS BASED TRAINING CENTRE, ACCOMODATION CAN BE PROVIDED AT A FIXED FEE.
FUNDING MAY BE AVIALABLE. PLEASE CALL FOR MORE INFORMATION
| Delivery: |
|
| Category: |
SOME OF THE AREAS YOU WILL BE STUDYING
Safety
Ref Task Competence
S-1A Kinetic lifting
S1B Lifting equipment
S-2 Safe use of ladders
S-3 Safe use of stand steps
S4 Safe use of mobile scaffolds
S-5A Safe assembly of LPG equipment
S-5B Safe use of LPG equipment
S-6 Fire fighting
S-7A Hazardous materials - sheet lead
S-7B Hazardous materials - asbestos
S-7C Hazardous materials - solvents
S-8 Working safely with hand tools
S-9 Working safely with power tools
Copper Tube
Ref Task Competence
CT-1 Copper Tube Component Positions
CT-2 Copper Tube Fixing Positions
CT-3 Copper Tube Pipe Fitting and Dimensions
CT-4 Copper Tube Pipe Fitting and Dimensions
CT-5 Copper Tube Marking and Cutting
CT-6A Copper Tube Machine Bending
CT-6B Copper Tube Machine Bending (2)
CT-6C Copper Tube Machine Bending (3)
CT-7 Copper Tube Jointing & Testing
CT-8 Copper Tube Making Fixings
CT-9 Copper Tube Fabrication and Installation
Plastic Pipework
Ref Task Competence
PP-1 Soil and Waste Pipe Fitting and Dimensions
PP-2 Soil and Waste Fabrication and Installation
PP-3 Rainwater system
PP-4 Pressure pipe – pipe & fitting dimensions
Air Testing
Ref Task Competence
AT-1 Air test - soil pipe
Low Carbon Steel (LCS)
Ref Task Competence
SP-1 LCS – pipe & fitting requirements
SP-2 LCS – component positions
SP-3 LCS – fixing positions
SP-4 LCS – pipe & fitting dimensions
SP-5 LCS – marking & cutting
SP-6A LCS – machine bending (1)
SP-6B LCS – machine bending (2)
SP-7 LCS – jointing & testing
SP-8 LCS – fabrication & installation
Sheet Lead Weathering
Ref
Task Competence
SW-1
Sheet lead – identifying components
SW-2
Sheet lead – measuring components
SW-3
Sheet lead – cutting lead
SW-4
Sheet lead – forming components
SW-5
Sheet lead – lead slate
SW-6
Sheet lead – chimney weathering set
SW-7
Basic maintenance
Airing Cupboard Installation
Ref Task Competence
AC-1 Airing cupboard – storage cistern
AC-2 Airing cupboard – hot water cylinder
Bathroom Installation
Ref Task Competence
BI-1 Bathroom – WC suite
BI-2 Bathroom – Bath
BI-3 Bathroom – Basin
BI-4 Bathroom – Radiator
BI-5 Bathroom – Combi Jig
Decommissioning
Ref
Task Competence
DC-1
Decom – hot & cold water system
DC-2
Decom – sanitation system
Routine Maintenance
Ref Task Competence
RM-1 Maintenance – pillar tap and float valve
RM-2 Maintenance – shower mixer valve
RM-3 Maintenance – radiator valve
RM-4 Maintenance – WC siphon
Environmental Awareness
Ref Task Competence
EA-1 Economic use of materials
Temporary Continuity Bonding
Ref Task Competence
TB-1 Application of temporary earth bonding
