CPCS A42 Crusher
Sponsored links
Course Content
Describe the nature of the sector of industry and their role and responsibilities as a plant operator.
Name and explain the purpose of principle components, the basic construction, controls and terminology.
Confirm with Manufacturer’s requirements as per the operators handbook, other types of information source and the relevant regulations and legislation.
Undertake all pre-use checks.
Configure and ready for travel (mobile units).
Travel over rough, undulating ground, and level surfaces.
Manoeuvre in confined spaces (mobile units).
Configure and set for crushing duties to produce aggregate to specified sizes.
Explain actions required for hazards, underground and overhead services.
Crush differing types of materials.
Sort materials into graded sizes.
Control and maintain the work flow rate.
Use appropriate communication procedures before and during work.
Explain procedures for blockages and foreign object removal.
Carry out shut down and securing procedures.
Explain the loading and unloading disassembly procedures for machine transporting.
| Delivery: |
|
| Regions: |
|
| Category: |
The Training and CPCS Tests take place at your site - anywhere in the UK.
