Sheet Piling & Cofferdams - Construction
Sponsored links
The direct and consequential cost of temporary works is a significant portion of the total cost of a civil engineering or building project. It is therefore essential that proper attention is paid to the economic design, construction and safety aspects of these works.
The simple principles of installation and extraction will be explained, together with numerous practical hints based on the lecturer's 30 years of experience. The main types of plant and equipment will be covered, as will the adoption of the principles of safe trenching.
Sources of information, and costs and outputs are given towards the end of the course.
Course Objectives:
At the end of the workshop, participants should be able to:-
Recognise the common methods used to support ground, with detailed knowledge of how to form sheet pile structures and cofferdams.
Relate the practical aspects of sheet piling to design.
Course Outline:
Types of Ground Support
Types of Pile
Cofferdam Arrangements
Trenching
- Video
Brief for the Designer
Choice of Section
Walers and Struts
Hammers
- Videos
Driving Techniques
- Videos
Costs and Outputs
Sources of Information
Discussion and Administration
Course Duration:
1 day (7hrs15) IPD/CPD
| Delivery: |
|
| Regions: |
|
| Category: |
Cardiff: 6 July 2010
For more information please contact
trainingcentres@symmonsmadge.co.uk
or call 01446 775959 and ask for Carol Salter
